page 1
page 2
page 3
page 4
page 5
page 6
page 7
page 8
page 9
page 10
page 11
page 12
page 13
page 14
page 15
page 16
page 17
page 18
page 19
page 20
page 21
page 22
page 23
page 24
page 25
page 26
page 27
page 28
page 29
page 30
page 31
page 32
page 33
page 34
page 35
page 36
page 37
page 38
page 39
page 40
page 41
page 42
page 43
page 44
page 45
page 46
page 47
page 48
page 49 page 50
page 51
page 52
page 53
page 54
page 55
page 56
page 57
page 58
page 59
page 60
page 61
page 62
page 63
page 64
page 65
page 66
page 67
page 68
page 69
page 70
page 71
page 72
page 73
page 74
page 75
page 76
page 77
page 78
page 79
page 80
page 81
page 82
page 83
page 84
page 85
page 86
page 87
page 88
page 89
page 90
page 91
page 92
page 93
page 94
page 95
page 96
page 97
page 98
page 99
page 100
page 101
page 102
page 103
page 104
page 105
page 106
page 107
page 108
page 109
page 110
page 111
page 112
page 113
page 114
page 115
page 116
page 117
page 118
page 119
page 120
page 121
page 122
page 123
page 124
page 125
page 126
page 127
page 128
page 129
page 130
page 131
page 132
page 133
page 134
page 135
page 136
page 137
page 138
page 139
page 140
page 141
page 142
page 143
page 144
< prev - next > Energy Mechanical Power tech_guidelines_gravity_goods_ropeway (Printable PDF)
8Construction Records
8.1 Time Sheets
During the construction work, the supervisor
should maintain a time sheet to monitor time
and activity of each worker on site. The main
components of time sheets are:
Date: The date (day, month and year) for each
operation day
Activity: This describes in detail the work
done on a particular day. When different tasks
are performed on the same day, the tasks
are separated with the time inputs on each
operation
Labour and time: The number and skill/type
of people involved on a particular operation
are detailed. The time spent by each number
and type of labour in a particular operation is
calculated as a total
Production: The quantifiable output for each
particular task is given. The output is quoted
in per unit rate for each operation
Remarks: This section allows for any comments
or remarks pertinent to the tasks
8.2 Design Modification or Work Alteration Record
No matter how accurately the design and working
drawings have been made, sometimes due to
unavoidable situation changes may occur in the
design and drawings as construction progresses.
These changes must be consulted with the design
engineer or expert. All those changes made while
execution should be reflected on the design sheets
and working drawings, and separate amended
design and drawings need to be produced. The
amended design and drawings together with any
on site instructions thereof will constitute the
"As Built" or completion drawings verified by the
project engineer/supervisor.
41